FLAMEOUT® Limited combustible and flame retardant breather membranes and vapour control layers (VCLs)

Projects & Case Studies: FlameOut Flame Retardant and Limited Combustible Membranes

2022-07-14T10:57:56+01:00

Safe One chosen for another flagship development

ITP has supplied Safe One, the UK’s most advanced breather membrane, for a key phase at Cardiff Central Square, a flagship development which is delivering new civic and recreational space described as ‘a new gateway to the capital of Wales.’

2022-06-06T13:33:15+01:00

World-class studio is fine-tuned with help from ITP

ITP’s FlameOut Breathe Membrane is demonstrating its performance qualities in the latest renovation of a listed building in London which has become a unique recording studio used by some of the biggest names in music.

2022-08-05T23:19:50+01:00

ITP products provide perfect balance at ‘Jenga’ hotel

ITP provided a dual contribution to the construction of the Leonardo Hotel in central Manchester. We supplied our Powerclad Standard Flame Retardant 2.2m wide scaffold sheeting to facilitate site work, which includes the installation of our second product to be featured at the development: the FlameOut Breathe FR breather membrane.

All Projects & Case Studies
Powerclad Projects
Powerlon Projects
Powerbase Projects